3/18/12

Summary Graded Two


Abu Dhabi Wind Farm

Abu Dhabi’s Masdar Company has started a project Dh734.6 in wind farm and one of source renewable energy close to the Saudi Arabian border. Because the project needs windy power and the area has low windy, Masdar is designing a special turbine blades. Masdar wind farm has built two renewable plants shams 1 and nour 1 join 100 megawatt to produce renewable energy 7% to Abu Dhabi government. Masdar plant has taken place near Saudi border to produce electricity. Wind farm of masdar get ready soon to generate power early in two years. The nature of the wind is limited in the region and it’s harder to develop in the GCC than solar power. According to masdar estimates, Msader wind farm plant could cost $2 million per megawatt and$200 million as total price. Abu Dhabi Government, banks and foreign partners are subsidizing the project.

References
Yee, A. (2011, April 27). Masdar plan for $200m pioneering wind farm - The National. Latest and breaking news | thenational.ae - The National. Retrieved March 6, 2012, from http://www.thenational.ae/business/energy/masdar-plan-for-200m-pioneering-wind-farm


APA formatting by BibMe.org.

Name: Yousif Mohamed Khamas
Section: CIQ

ID: H00237273
Word Counts: 142


No comments:

Post a Comment